NY-14-C049 -- Working with Constraints: An Interstate Tunnel Retrofit

Click to enlarge $8.00

  • Model: NY-14-C049 -- Working with Const
  • In Stock

Add to Cart:


CONFERENCE PROCEEDING published 2014 by ASHRAE

Written By David G. Newman, PE, CEng; Hing-Wai Wong


Product Details

Published: 2014
Number of Pages:8
File Size: 1 file , 2.6 MB
Product Code(s): D-NY-14-C049


Full Description

The retrofitting of a new tunnel ventilation system within an existing structure typically presents constraints around which the design mustbe engineered. This paper presents an example of such a retrofit design in which the ventilation capacity of an existing interstate tunnel issubstantially increased to address present-day life-safety requirements. A number of design alternatives are identified and evaluated leading to theselection of a preferred concept. The paper discusses the constraints encountered, and outlines the measures taken to mitigate them in order tomaximize the performance of the new tunnel ventilation system.

Citation: ASHRAE Papers CD: 2014 ASHRAE Winter Conference, New York, NY